Research Article · Open Access
Integrated Planning and Coordinated Allocation of DG and DSTATCOM Considering Radial Distribution Network Reconfiguration
- Department of Electrical Engineering, Sitamarhi Institute of Technology, Sitamarhi, Bihar, India
- Corresponding author: imranquadri.ee@sitsitamarhi.ac.in
Abstract
In order to enhance the operational efficacy of distribution power networks (DPNs) across techno economic and environmental aspects within a real-time operational framework, meticulous regulation of active as well as reactive power is imperative. In the present study, a Comprehensive Teaching-Learning based Optimization (CTLBO) algorithm is employed for network reconfiguration (NR) and optimal allocation of Distributed generations (DGs) along with Distribution Static Synchronous Compensators (DSTATCOMs) for single-objective in the IEEE 33-bus radial distribution systems (RDSs). Several case studies demonstrate that simultaneous NR and DGs along with DSTATCOM allocation is the most effective solution for reduction of network active power losses ultimately reduces operational costs and emission. The results further demonstrates the superiority in terms of convergence characteristics, solution robustness and global optimality of the CTLBO algorithm under complex , multi-criteria constraints for NR and DGs along with DSTATCOM allocation in RDS against established bio-inspired metaheuristics such as the Gravitational Search Algorithm (GSA), Fireworks algorithm (FWA), Harmony Search Algorithm (HSA), Genetic Algorithm (GA) and Refined genetic algorithm (RGA).
Keywords: CTLBO, Distributed Generation, DSTATCOM, Network reconfiguration, Radial distribution systems.
1. Introduction
The increasing demand of electrical energy, coupled with the limitations of conventional power generation and transmission systems, has necessitated the modernization of distribution networks. Distribution systems, particularly radial distribution network such as the IEEE 33-bus systems, often suffer from high power losses due to nature of high R/X ratio, poor voltage profile, and reduced system reliability due to their long radial structure and unidirectional power flow. To overcome these challenges, the integration of advance technologies such as Distributed Generation (Samala et. al., 2020; Khan et. al.,2022), Distribution Static Compensator (DSTATCOM) (Yuvaraj et. al., 2017; Salimon et. al., 2023) and network reconfiguration (Pegado et. al., 2019; Otuo et.al., 2023) has emerged as an effective solution.
Distributed Generation units, when optimally placed and sized, can significantly reduce active and reactive power losses, improve voltage stability, and enhance the overall efficiency of the distribution network. Similarly, DSTATCOM, a shunt-connected FACTS devices, provides dynamic reactive power support, thereby improving voltage regulation, power factor, and system reliability under varying load conditions. In addition, network reconfiguration, which involves changing the open/closed status of tie/sectional switches in the distribution network, offers an economical method to minimize power losses and balance load distribution without requiring additional infrastructure.
The optimal allocation of DGs and DSTATCOMs, combined with effective reconfiguration strategies, ensures benefits (Yuvaraj et. al., 2018; Shaheen et al. 2022; Salkuti et al.,2022; Kannemadugu et al. 2025; Weqar et al. 2018) such as:
Minimizes of active and reactive power losses.
Enhance voltage stability and power quality.
Improves reliability and security of the radial network.
Better utilization of existing distribution infrastructure.
Hence, the coordinated planning and optimal allocation of these technologies in a 33-bus radial distribution network is essential for achieving an efficient, reliable, and sustainable modern power distribution network.
| Authors / Year | Method / Algorithm | Focus Area | Test System | Key Outcomes |
|---|---|---|---|---|
| Marjani et al., 2018 | MOPSO + TOPSIS | DSTATCOM + Reconfiguration | IEEE (33-bus & 69-bus) | Loss minimization, voltage profile improvement, better loadability through multi-objective optimization |
| Reddy et al., 2023 | PLI method | DG + DSTATCOM | IEEE 33-bus | Effective loss reduction via combined DG and D-FACTS using PLI |
| Tolabi et al., 2015 | Fuzzy-ACO | Reconfiguration + PV + DSTATCOM | IEEE 33-bus | Simultaneous PV & DSTATCOM placement with reconfiguration reduces losses and improves voltage profile more than separate methods |
| Dash et al., 2021 | SAR (Search & Rescue algorithm) | DG + DSTATCOM + Reconfiguration | IEEE 33-bus | Improved loss reduction using coordinated allocation with SAR metaheuristic |
| Balamurugan et al., 2018 | Whale Optimization (WOA) | DSTATCOM sizing & placement | IEEE 69-bus | Effective voltage profile improvement and loss reduction via DSTATCOM allocation |
| Amin et al., 2022 | Gorilla troop’s optimizer (GTO) | PV-DG + DSTATCOM | 94-bis | Improves total annual cost, the system voltage deviations, and the system stability. |
| Razavi et al., 2020 | Stochastic DNR + improved CSA | Daily Reconfiguration with renewables | IEEE 33-bus | Multi-objective optimization (loss, voltage, reliability, cost) under renewable uncertainty |
| Sirat et al., 2019 | DG placement under stochastic DG nature | DG uncertainty modeling | IEEE 33-bus | Considerable cost and loss reduction by modeling wind, solar, biomass DGs stochastically |
| El-Zonkoly et al., 2011 | PSO for multi-DG integration | DG placement | IEEE 33-bus (and others) | Loss, MVA flow, and intake reductions; voltage stability margin improved |
| Sambaiah et al., 2020 | GOA (Grasshopper) | DG + Reconfiguration + DSTATCOM | IEEE 33-bus (also 69,118) | Loss and voltage profile improved with combined reconfiguration, DG, DSTATCOM & PV |
| Chinnaraj et al., 2020 | CSA (Cuckoo Search Algorithm) | DG + DSTATCOM | IEEE 33-bus & 136-bus | Joint allocation improved voltage profile and reduced losses |
| Chinnaraj & Kumar et al., 2020 | LSF + LSA-SM | DG + DSTATCOM | IEEE 33-bus and 69-bus | Both loss and voltage profile enhanced through combined planning |
| Injeti et al., 2020 | PSO + BO (Butterfly Optimization) | DG + PEV presence | IEEE 33-bus | Reduced daily power loss and improved voltage with DG considering PEV loads |
| Balu et al., 2021 | SPBO (Student Psychology-Based) | DG allocation | IEEE 33-bus, 69-bus, 136-bus unlabeled | Loss and VSI minimization effective across systems |
| Alam et al., 2018 | MINLP | DG integration | IEEE 33-bus & 69-bus | Significant loss reduction and voltage improvement with optimally allocated DGs |
| El-Arini et al., 2024 | GWO + DG + Reconfiguration + Capacitor Banks | Multi-tech coordinated planning | IEEE 33-bus & others | Excellent performance in simultaneous optimization of DG, reconfiguration, and capacitors |
| Mohamed et al., 2022 | IGWO + Sensitivity Factors | DG + DSTATCOM | IEEE 33-bus | Reduced computational burdens with coordinated planning considering load modelling |
| Da Silva et al., 2008 | Group Teaching Optimization (GTO) | DG + DSTATCOM | IEEE 33-bus | Improved DISCO voltage stability and maximized combined DISCO–DG owner cost–benefit through coordinated DG and DSTATCOM planning |
| Kannemadugu et al., 2025 | Genetic Algorithm (GA) | DG + SVC | IEEE 38-bus | Reduced real and reactive power losses and improved voltage profile and system stability via optimal DG–SVC integration |
| Shukla et al., 2023 | Multi-Objective Particle Swarm Optimization (MOPSO) | DG + Shunt Capacitors | IEEE 33-bus and IEEE 69-bus | Achieved up to 94.8% power loss reduction and significant voltage stability improvement through optimal simultaneous and independent DG–capacitor placement |
2. Research Aim and Motivation
Many articles are reported, integration of distributed power resources to DPNs marks improvement in VP (Patel et al., 2025; Das et.al., 2008; Haldar et.al., 2015) line loadability improvement (Yaghoobi et al., 2018; Hung et. al., 2014; Quadri et al., 2018; Moravej et. al., 2013), post fault fast voltage recovery (Yaghoobi et. al., 2018), reduction in APL (Haldar et.al., 2015; Luo et al., 2018; Lakervi et. al., 1996), effect on greenhouse gas (Quadri et al., 2018) and voltage stability index improvement (Quadri & Bhowmick et. al., 2018; Solati et al., 2025)]. Further, concurrent reconfiguration (RE) of network and allocation of scattered energy storage (Santos et al., 2017) considerably enhance the penetration of DGs in distribution networks. In this perspective, limited investigative research literature are available to show the impact of simultaneous allocation of DGs, DSTATCOMs and radial network reconfiguration in the DNs. Therefore, this paper deals with detailed analysis on the impact of the allocation of DGs, DSTATCOMs and radial network reconfigurations in the DPNs. This investigation aims to provide complete solutions for DGs, DSTATCOMs locations, capacities, and network topologies under maximum load conditions. This paper uses a nature inspired CTLBO technique for reconfiguration of distribution network and placement of multiple DGs and DSTATCOMs in the distribution systems. The usefulness of the suggested method is validated on the IEEE 33-bus RDS by placing DGs and DSTATCOMs along with network reconfiguration optimally for 33-bus network.
The summary of the analysis carried out in this paper is as follows:
Siting and sizing of DGs and DSTATCOMs for single-objective to maximize DPNOs benefits.
Impact of simultaneous NR, DGs, and DSTATCOM allocation on network performance.
Seven case studies presented here with maximum loading pattern (1.0 p.u.) for IEEE 33-bus RDS.
Comparative results using CTLBO vs. Gravitational Search Algorithm (GSA), Fireworks algorithm (FWA), Harmony Search Algorithm [HSA], Genetic Algorithm (Imran et al., 2014) and refined genetic algorithm (RGA) considering performance indices: APL, QPL VP improvement, and voltage stability index.
The remaining of the paper is structured as follows: Section 2 details the modeling of DGs DSTATCOM by considering single objective functions. Section 3 explains description of the CTLBO algorithm. Section 4 illustrates the procedure for the allocation of DGs, DSTATCOMs. Section 5 explains the results and the comparative analysis with other existing methods. Conclusions are reported in Section 6.
3. Problem formulation
Here a typical radial DPN is described in Figure 1. are the resistances and the reactances, respectively, of the jth line between bus m and m+1. The loads associated at buses m and m+1 are and , respectively. and are the respective voltages at node m and m+1 respectively.
3.1 Single Objective function (SOF)
The objective of optimally placed DSTATCOMs in RDS is to decrease the network APL, enhance the Voltage stability index and voltage profile while maintaining all the constraints within its limit. Explanations of all the Single objective functions are as follows,
| Parameter/objectives | Description / Formulation | Equation |
|---|---|---|
| Active Power Loss () | Where | (1) |
| SOF-1 | (2) | |
| After DGs and DSTATCOMs Allocation | (3) | |
| Constraints | Active & Reactive Power Balance: | (4) |
| (5) | ||
| (6) | ||
| Voltage Limits: 0 | (7) | |
| Line Thermal Limits: | (8) | |
Injected Active () and Reactive () Power Limits: |
(9) |
The effect of DGs and DSTATCOM allocation in the DPNs are computed using the indices addressed in Table 2. The VSI functions as an indicator of the network’s proximity to voltage failure; improving VSI toward unity reflects enhanced voltage stability margins. The VDI captures the cumulative deviation of bus voltages from their nominal values across the network, with an ideal value of zero signifying optimal voltage regulation.
4. Radiality of Distribution Network and CTLBO Algorithm
After network reconfiguration, it is essential to ensure that the distribution system remains a radial topology by properly opening or closing tie and sectionalizing switches. In this work, network radiality is tested using a spanning tree methodology based on graph theory, as detailed in (Quadri et al., 2018). The confirmation is accomplished using the MATLAB command ‘graphisspantree (D)’, where ‘D’ denotes the adjacency matrix of the distribution network of the undirected graph. If ‘D’ resembles to valid spanning tree, the command returns a logical value of ‘1’, representing that the network remains radial. The adjacency matrix ‘D’ consists of binary entries, where ‘1’ characterizes the existence of a branch between two nodes and ‘0’ specifies its absence (Quadri et al., 2018).
The Comprehensive Teaching–Learning-Based Optimization (CTLBO) algorithm teaching and learning phase can expressed as Table 3 (Quadri & Bhowmick et al., 2018).
5. Process to find optimal size and location of DGs, DSTATCOMs
The primary aim is to optimize network APL (Ploss) by injecting or absorbing active power by DGs and reactive power by (QDSTATCOM) in the distribution networks. The suggested approach ensures the optimal size and placement of multiple DSTATCOMs as given below:
5.1 Implementation of CTLBO for SOF in distribution network at nominal load
This section describe the implementation of CTLBO algorithm for the allocation of DSTATCOMs to satisfy the various single objective function while meeting all the constraints requirement. In this paper, multiple DSTATCOMs are placed in the RDS to minimize real power loss, annual energy and cost savings using CTLBO. Allocation of DSTATCOMs in RDS for APL minimization is based on nominal load level.
| Phase | Mathematical Representation | Equation |
|---|---|---|
| Teaching Phase | (10) | |
| (11) | ||
| Learning Phase | (12) | |
| (13) |
| Parameter | Value |
|---|---|
| Teaching Factor Rate ‘a’ | 0.2 |
| Solution Vector (SV) | 100 |
| Maximum Iteration for Case 1, 2, 3, 4 | 200 |
| Maximum Iteration for Case 5, 6, 7, 8 | 500 |
For the allocation of DSTATCOMs without reconfiguration of the network, the quantity of variables in the solution vector (SV) will be twice of the number of as shown below,
Where , are discrete variables (DSTATCOMs site) and , are continuous variables (DSTATCOMs size) in MVAr.
Representation of simultaneous reconfiguration, DSTATCOMs allocation and DSTATCOMs sizing in SV is presented as shown below,
Where, are open tie/sectionalizing switches. Radiality of DN is confirmed by either opening of the sectionalizing switches or closing tie-switches.
The aforesaid sequence of steps is implemented to achieve the desired objective by placing DSTATCOMs in the distribution networks.
Step 1) First solution vector matrix generation.
In solution vector matrix (SVM) each row shows a set of solutions for the defined objective function F(Xi) in particular optimization problem. Each decision variable (Xi ) is computed using equation (16) as shown below.
SVM (solution vector matrix) is given below,
Step 2) Generate new solution vector.
After initialization using eqn. (16) of the CTLBO algorithm, SVM is generated according to eqn. (10), (12), & (13) while satisfying all the constraints given in eqn. (4)-(9) with parameters values for proposed CTLBO algorithm in Table 4.
Step 3) Updating the solution vector matrix
The fitness is calculated for each solution vector to achieve the objective. If the fitness of SV corresponding to is better than that of, the SVM is updated. Until the termination condition is met, the SVM creation and updating process is repeated. The objective function is said to achieve by the solution vector that has the highest fitness value in the SVM.
5.2 Algorithm for multi-DGs and DSTATCOMs allocation
The processes used to assign DGs, DSTATCOMs and perform network reconfiguration using the CTLBO algorithm to explore a single objective for network active power loss minimization is shown in Figure 3
6. Case Studies and Results
6.1 Selection of the Number of DSTATCOMS in 33-bus Radial Distribution Network
The optimal allocation of number of DSTATCOMs in 33-bus RDNs has been carried out with the objectives of maximizing power loss reduction and emission savings using CTLBO optimization technique while considering peak load. The impact of varying the number of DSTATCOMs (ranging from 1 to 5) on system performance listed in Table 5 has been analyzed.
For the 33-bus system, as illustrated in Figure 2, the deployment of 1, 2, 3, 4, and 5 DGs results in power loss reductions of 48.7 %, 57.6%, 64.74%, 67.46% and 67.98% respectively. The deployment of 1, 2, 3, 4, and 5 DSTATCOMs results in power loss reductions of 29.14 %, 32.82%, 34.84%, 34.98% and 35.17% respectively. From the graph, it is obvious that the majority of the enhancements in both power loss reduction happens with the allocation of up to 3 DGs. Beyond this, the incremental benefits become marginal. Therefore, for practical and further study are limited up to three DGs and DSTATCOM units.
6.2 DGs and DSTATCOMs allocation along with reconfiguration in Radial Distribution systems
In this section, the IEEE 33-bus RDS is used to allocate numerous DGs and DSTATCOMs allocation along with reconfiguration as efficiently as possible. First, using the CTLBO optimization technique, the optimal positions and sizes of several DGs and DSTATCOMs are determined while taking peak load into account. The SOF taken into consideration for the RDS is used to determine the optimal number of 3 DGS and 3 DSTATCOMs. The usefulness of the suggested approach for numerous DGs and DSTATCOMs deployment in the IEEE 33-bus RDS is confirmed by comparing the results with those of a number of other soft computing algorithms. The suggested approach was put into practice using MATLAB R2015a on a desktop PC with an Intel i5-4570 processor, 3.2 GHz, and 8GB of RAM.
The efficacy of the CTLBO optimization technique is demonstrated through the analysis of two RDS, namely 33-bus and 69-bus. The following cases are applied while comparing the outcomes:
Case 1: The system’s initial condition.
Case 2: Only reconfiguration of the network to reduce active power losses.
Case 3: Allocation of DGs alone.
Case 4: Allocation of DSTATCOMs alone.
Case 5: Allocation of simultaneous DGs and DSTATCOMs.
Case 6: Allocating DGs and reconfiguring the network simultaneously.
Case 7: Allocating DSTATCOM and reconfiguring the network simultaneously Allocation of DSTATCOMs alone.
Case 8: Allocating DGs, DSTATCOM and reconfiguring the network simultaneously.
6.3 IEEE 33-bus RDS
In [42], the comprehensive network specification is provided. It consists of 37 branches, 3 laterals, 33 buses and five tie switches that are kept open. 12.66 kV is the nominal voltage rating. The RDS’s nominal load demands are 2.3MVAr and 3.72 MW, respectively. The initial network configuration APL is 202.677 kW while RPL is 135.1409 kVAr. The base case VSI of this initial configuration RDS is 0.667168 (Quadri & Bhowmick et al., 2018). The Network initial base case KVA is 1000 KVA. The finding corresponding to the 33-bus RDS’s APL reduction are given in Table 6.
8. Results and Discussion
Table 6 indicates that, in the initial network configuration i.e. Case 1, the network’s power loss is 202.667 kW when every tie-switch is open. Case 2 shows that the RDS has the minimal APL of 139.55kW for the APL minimization target when tie-switches 7, 9, 14, 32, and 37 are opened while maintaining the network radiality. Additionally, it is noted that in case 3, placing 3 DGs with appropriate capabilities results in a 64.74% reduction in APL and 63.45% reduction in RPL. Among all the conditions shown in Table 6 and Table 7, Case 8 i.e. simultaneous NR, optimal DGs and DSTATCOMs siting and sizing gives the greatest active power loss reduction i.e. 96.17% and reactive power loss reduction of 95.37% followed by Case 5 where active power loss reduction i.e. 94.27% and reactive power loss reduction of 92.85% as seen in Figure 4. Hence, it is evident that instead of placing type III DGs along with network reconfiguration in the network, it is better to place DGs and DSTATCOMs simultaneously along with reconfigured network for maximizing power loss reduction in the network. It can be seen from Figure 4 that prior to the installation of DGs and DSTATCOMs all active and reactive power requirements are supplied by the substation. However, the introduction of DGs and DSTATCOMs into the network facilitates local fulfilment of active and reactive power demand. As a result, the flow of reactive power in different lines across the network is reversed. The DNs active power flow capacity is enhanced via local active and reactive power management. The minimum bus voltage in the network without DGs and DSTATCOMs for Case 1 is 0.91309 p.u. (at 18th bus), as shown in Figure 4. Furthermore, for Case 5, it improved to 0.9922 p.u. (at 8th bus). After 3 DGs and 3 DSTATCOMs along with reconfigured network for Case 8, it rises to 0.99287 p.u. (at 13th bus). The complete voltage profile of 33-bus radial distribution network for all the eight cases shown in Figure 5. It is evident from the convergence characteristics of CTLBO algorithm as shown in Figure 6 (a) that the best solutions obtained for case 2, case 3 and case 4 within 200 iterations while the best solutions obtained for case 5, case 6, case 7 and case 8 within 500 iterations as shown in Figure 6 (b).
| Performance Indices | Formulation |
|---|---|
| Active Power Loss Reduction (APLR) (%) | |
| Reactive Power Loss Reduction (RPLR) (%) | |
| Voltage Stability Index (VSI) |
9. Comparative Analysis Discussion
It is evident from the Table 8, that CTLBO gives better result for Case 2, Case 4 and Case 6 in comparison to GSA (Salkuti et al.,2022), FWA (Imran et al., 2014), HSA, GA and RGA (Rao et al., 2013) algorithms-based solutions. In Table 9, it is obvious that CLTBO having better result i.e. 94.27% and 96.17% for Case 5 and Case 8 respectively in comparison to GSA (Salkuti et al.,2022) algorithms-based solutions which is 68.43% and 66.89% for Case 5 and Case 8 respectively.
| Case 1 | Case 2 | Case 3 | Case 4 | |
|---|---|---|---|---|
| Base Case | Only RE | Only DG | Only DSTATCOM | |
| Open Switch | 33, 34, 35, 36, 37 | 7, 9, 14, 32, 37 | 33, 34, 35, 36, 37 | 33, 34, 35, 36, 37 |
DG size (MW) / (Bus No.) |
- | - | 0.7539789(14) | - |
| - | - | 1.0994388(24) | - | |
| - | - | 1.071416(30) | - | |
| DSTATCOM size (MVAr) /(Bus No.) | - | - | - | 0.3786869 (13) |
| - | - | - | 0.5442038 (24) | |
| - | - | - | 1.036668 (30) | |
| APL (kW) | 202.677 | 139.551 | 71.457 | 132.1724 |
| QPL (kVAr) | 135.140 | 102.304 | 49.3908 | 88.3305 |
| VI (p.u.) | 0.69511 (18) | 0.77359 (27) | 0.88039(33) | 0.77324(18) |
| Vmin (p.u.) | 0.91309 (18) | 0.93782 (32) | 0.96865(33) | 0.93773(18) |
| Case 5 | Case 6 | Case 7 | Case 8 | |
|---|---|---|---|---|
| Only DG and DSTATCOM | Both RE and DG | Both RE and DSTATCOM | Both RE, DG and DSTATCOM | |
| Open Switch | 33, 34, 35, 36, 37 | 11, 28, 31, 33, 34 | 7, 9, 14, 32, 37 | 5, 13, 20, 26, 35 |
| DG size (MW) / (Bus No.) | 0.747697/ (14) | 0.956938/ (7) | - | 1.1002 / (8) |
| 1.078236/ (24) | 0.722951 / (17) | - | 1.1285 / (25) | |
| 1.048484/ (30) | 1.279589/ (25) | - | 0.82439 / (32) | |
| DSTATCOM size (MVAr) / (Bus No.) | 0.365476/ (13) | - | 0.9595211/ (8) | 0.56978 / (8) |
| 0.518525/ (24) | - | 0.5239252/ (24) | 0.41614 / (24) | |
| 1.014679/ (30) | - | 0.96284007/ (30) | 1.0631 / (30) | |
| APL(kW) | 11.61465 | 50.717546 | 92.5846329 | 7.758331 |
| QPL (kVAr) | 9.665727 | 38.720157 | 69.8161129 | 6.2627060 |
| VI (p.u.) | 0.969266 (8) | 0.8976197 (16) | 0.83747914 (16) | 0.97206(31) |
| Vmin (p.u.) | 0.992226 (8) | 0.97343637(32) | 0.959521149 (33) | 0.99287 (13) |
| Case 2 | Case 3 | Case 6 | ||
|---|---|---|---|---|
| Only RE | Only DG | Only RE and DG | ||
| CTLBO | Open Switch | 7, 9, 14, 32, 37 | 33 34 35 36 37 | 11, 28, 31, 33, 34 |
| DGsize (MW) | - | 2.92483 | 2.959479 | |
| APL(kW) | 139.551 | 71.457 | 50.717 | |
| Vmin (p.u.) | 0.93782 (32) | 0.96865(33) | 0.97343 (32) | |
| GSA (Salkuti et al.,2022) | Open Switch | 7, 9, 14, 28, 37 | 33, 34, 35, 36, 37 | 7, 10, 14, 32, 34 |
| DGsize (MW) | - | 2979.4 | 3051.8 | |
| APL(kW) | 138.62 | 78.16 | 62.93 | |
| Vmin (p.u.) | 0.9412 (32) | 0.9653 (33) | 0.9692 (32) | |
| FWA (Imran et al., 2014) | Open Switch | 7, 9, 14, 28, 32 | 33, 34, 35, 36, 37 | 7, 11, 14, 28, 32 |
| DGsize (MW) | - | 1.7938 | 1.6841 | |
| APL(kW) | 139.98 | 88.68 | 67.11 | |
| Vmin (p.u.) | 0.9413 | 0.9680 | 0.9713 | |
| HSA (Rao et al., 2013) | Open Switch | 7, 9, 14, 32, 37 | 33, 34, 35, 36, 37 | 7, 10, 14, 28, 32 |
| DGsize (MW) | 1.7256 | 1.6684 | ||
| APL(kW) | 138.06 | 96.76 | 73.05 | |
| Vmin (p.u.) | 0.9342 | 0.9670 | 0.9700 | |
| GA (Rao et al., 2013) | Open Switch | 9, 28, 33, 34, 36 | 33, 34, 35, 36, 37 | 7, 10, 28, 32, 34 |
| DGsize (MW) | 1.6044 | 1.9633 | ||
| APL(kW) | 141.60 | 100.1 | 75.13 | |
| Vmin (p.u.) | 0.9310 | 0.9605 | 0.9677 | |
| RGA (Rao et al., 2013) | Open Switch | 7, 9, 14, 32, 37 | 33, 34, 35, 36, 37 | 7, 9, 12, 27, 32 |
| DGsize (MW) | 1.777 | 1.774 | ||
| APL(kW) | 139.46 | 97.60 | 74.32 | |
| Vmin (p.u.) | 0.9315 | 0.9687 | 0.9691 |
| Case 5 | Case 7 | Case 8 | ||
|---|---|---|---|---|
| Only DG and DSTATCOM | Both RE and DSTATCOM | Both RE, DG and DSTATCOM | ||
| CTLBO | Open Switch | 33, 34, 35, 36, 37 | 7, 9, 14, 32, 37 | 5, 13, 20, 26, 35 |
| DGsize (MW) | 2.874417 | - | 3.05309 | |
| DSTATCOM Size (KVAr) | 1.89868 | 2.44628637 | 2.04902 | |
| APL(kW) | 11.61465 | 92.5846 | 7.758331 | |
| Vmin (p.u.) | 0.992226 (8) | 0.95952 (33) | 0.99287 (13) | |
| GSA(Salkuti et al.,2022) [9] | Open Switch | 33, 34, 35, 36, 37 | 7, 14, 28, 33, 36 | 7, 11, 26, 32, 33 |
| DGsize (MW) | 3040.7 | - | 3108.4 | |
| DSTATCOM Size (KVAr) | 1125.8 | 1125.8 | 1182.6 | |
| APL(kW) | 63.96 | 78.32 | 67.11 | |
| Vmin (p.u.) | 0.9649(18) | 0.9610(18) | 0.9735(18) |
10. Merits and Limitations of CTLBO Algorithm
The proposed CTLBO algorithm gives the advantages of metaheuristic technique by incorporating the better exploration and fast convergence capability. This hybrid approach demonstrates, enhanced performance in the allocation of Distributed Generators (DGs), DSTATCOMs and network reconfiguration of the distribution systems.
The CTLBO algorithm meritoriously manages mixed-integer decision variables where DG location and network reconfiguration parameters are discrete, and DG sizes are continuous along with system constraints, including bus voltage limits and DSTATCOM capacity limits. Comparative results shows that the CTLBO overtakes existing methods such as the Gravitational Search Algorithm (GSA), Fireworks algorithm (FWA), Harmony Search Algorithm [HSA], Genetic Algorithm and Refined genetic algorithm (RGA) (Rao et al., 2013) in terms of solution quality and constraint handling capability.
Though the standard TLBO algorithm is nearly parameter independent, the CTLBO requires proper tuning to achieve global optimization and accelerated convergence. Accordingly, more simulations were conducted to identify optimal parameter setting. The final tuned parameters used for DGs and DSTATCOMs allocation and network reconfiguration are listed in Table 4.
11. Conclusions and Future Scope of Work
This study recommends an optimization framework based on the TLBO algorithm for simultaneous network reconfiguration, Distributed Generations and optimal allocation of Distribution Static Compensator in IEEE 33-bus RDS. Simulation results validate that the simultaneous implementation of network reconfiguration, Distributed Generations and DSTATCOMs yields the most promising outcomes in terms of objective function performance. The addition of DSTATCOMs in distribution lines, remarkably alters reverse power flow patterns, thereby increasing the overall power transfer capability of the system.
The outcomes further Validate that determining the optimal number of, DGs and DSTATCOM units is essential for minimizing power loss. Comparative analysis confirms that the proposed CTLBO-based approach attains superior results in terms of power loss when, benchmarked against several existing soft computing techniques. Since, the CTLBO algorithm in this work has been applied to deterministic loading conditions with single objective under various system constraints, it holds substantial potential for extension to distributed network planning. Such applications involve a high number of decision variables and constraints, mainly due to the inherent uncertainties associated with distributed energy resources and real-time load fluctuations.
| Nomenclature | |||
|---|---|---|---|
| DNO | Distribution Network Operator | FWA | Fireworks algorithm |
| DGs | Distributed Generations | FWA | Harmony Search Algorithm |
| CTLBO | Comprehensive Teaching-Learning based Optimization | NR | network reconfiguration |
| DSTATCOMs | Distribution Static Synchronous Compensators | RE | Reconfiguration |
| RDS | Radial distribution systems | GSA | Gravitational Search Algorithm |
| GA | Genetic Algorithm | RGA | Refined genetic algorithm |
| DS | distribution systems | SOF | Single Objective Function |
| VP | Voltage Profile | APLR | Active Power Loss Reduction |
| RPL | Reactive Power Loss | RPLR | Reactive Power Loss Reduction |
| APL | Active Power Loss | FACTS | Flexible Alternating Current Transmission System |
| VSI | Voltage Stability Index | Active power loss | |
| Resistance of jth branch | Reactance of jth branch | ||
| mth node voltage | Current through jth branch | ||
| Total active power demand | Total reactive power demand | ||
| Total active power at node ‘m’ | Total reactive power at node ‘m’ | ||
| Total active power load demand at node ‘m’ | Total reactive power load demand at node ‘m’ | ||
| Total active power injected by DGS at node ‘m’ | Total reactive power injected by DGS at node ‘m’ | ||
| Total active power injected by DGS | Total reactive power injected by DSTATCOMs | ||
| New variable value of uth solution vector | Old variable value of uth solution vector | ||
| Random variable between ‘0’ and ‘1’ | Worst solution variable vector of previous iteration | ||
| Variable of randomly selected vth solution vector | Variable of randomly selected wth solution vector | ||
| Fitness value of vth solution vector |
Declaration of Ethical Standards
As the author of this study, I declare that all ethical standards complied.
Credit Authorship Contribution Statement
I. A. Quadri: writing—original draft, visualization, software, methodology, investigation, formal analysis, data curation, validation, project administration;
Declaration of Competing Interest
Not applicable
Funding / Acknowledgements
This research received no external funding.
Availability of data and materials
All the relevant data is included in the manuscript.
References
Samala, R. K., & Kotapuri, M. R. (2020). Optimal allocation of distributed generations using hybrid technique with fuzzy logic controller radial distribution system. SN Applied Sciences, 2, 191.
Khan, M. H., Ulasyar, A., Khattak, A., Zad, H. S., Alsharef, M., Alahmadi, A. A., & Ullah, N. (2022). Optimal sizing and allocation of distributed generation in the radial power distribution system using honey badger algorithm. Energies, 15(16), 5891.
Yuvaraj, T., Ravi, K., & Devabalaji, K. R. (2017). DSTATCOM allocation in distribution networks considering load variations using bat algorithm. Ain Shams Engineering Journal, 8(3), 391–403.
Salimon, S. A., Adebayo, I. G., Adepoju, G. A., & Adewuyi, O. B. (2023). Optimal allocation of distribution static synchronous compensators in distribution networks considering various load models using the black widow optimization algorithm. Sustainability, 15(21), 15623.
Pegado, R., Ñaupari, Z., Molina, Y., & Castillo, C. (2019). Radial distribution network reconfiguration for power losses reduction based on improved selective BPSO. Electric Power Systems Research, 169, 206–213.
Otuo-Acheampong, D., Duku, R., Rashed, G. I., Mensah, A. A., & Haider, H. (2023). Application of optimal network reconfiguration for loss minimization and voltage profile enhancement of distribution system using heap-based optimizer. International Transactions on Electrical Energy Systems, Article ID 9930954.
Yuvaraj, T., & Ravi, K. (2018). Multi-objective simultaneous DG and DSTATCOM allocation in radial distribution networks using cuckoo search algorithm. Alexandria Engineering Journal, 57(4), 2729–2742.
Shaheen, A., Elsayed, A., Ginidi, A., El-Sehiemy, R., & Elattar, E. (2022). Reconfiguration of electrical distribution network-based DG and capacitors allocations using artificial ecosystem optimizer: Practical case study. Alexandria Engineering Journal, 61(8), 6105–6118.
Salkuti, S. R. (2022). An efficient allocation of D-STATCOM and DG with network reconfiguration in distribution networks. International Journal of Advanced Technology and Engineering Exploration, 9(88), 299–309.
Weqar, B., Khan, M. T., & Siddiqui, A. S. (2018). Optimal placement of distributed generation and D-STATCOM in radial distribution network. Smart Science, 6(2), 125–133.
Marjani, S. R., Talavat, V., & Galvani, S. (2018). Multi-objective placement and sizing of D-STATCOM in radial distribution networks using MOPSO and TOPSIS. International Transactions on Electrical Energy Systems, 28(10), 1–19.
Reddy, K. R., Kumar, M. S., & Kumar, P. R. (2023). Optimal placement of DG and D-FACTS for active and reactive power loss minimization in distribution networks. Journal of Applied Research and Technology, 21(1), 25–37.
Tolabi, H. B., Ali, M. H., & Rizwan, M. (2015). Simultaneous reconfiguration, DG and DSTATCOM allocation in radial distribution systems using a fuzzy–ACO approach. Turkish Journal of Electrical Engineering & Computer Sciences, 23(6), 1571–1587.
Dash, N. S., Kale, V. S., Nandini, P. S., & Duppala, D. (2021). SAR based optimal allocation of DG, DSTATCOM and reconfiguration of distribution system. In Proceedings of the International Conference on Advances in Power, Signal, Control and Computation (pp. 41–53). Springer.
Balamurugan, P., Yuvaraj, T., & Muthukannan, P. (2018). Optimal allocation of DSTATCOM in distribution networks using whale optimization algorithm. Engineering Technology & Applied Science Research, 8(6), 3543–3547.
Amin, A., Ebeed, M., Nasrat, L., Aly, M., Ahmed, E. M., Mohamed, E. A., Alnuman, H. H., & Abd El-Hamed, A. M. (2022). Techno-economic evaluation of optimal integration of PV-based DG with DSTATCOM functionality considering solar irradiance and loading variations. Mathematics, 10(14), 2543.
Razavi, S. M., Momeni, H. R., Haghifam, M. R., & Bolouki, S. (2020). Multi-objective stochastic distribution network reconfiguration with renewable energy resources using improved crow search algorithm. arXiv preprint, arXiv:2009.09472.
Sirat, A. P. (2019). Stochastic modeling for optimal placement of distributed generation in radial distribution networks. arXiv preprint, arXiv:1911.06748.
El-Zonkoly, A. M. (2011). Optimal placement of multi-distributed generation units including different load models using particle swarm optimisation. IET Generation, Transmission & Distribution, 5(7), 760–771.
Sambaiah, S., & Reddy, K. (2020). Simultaneous reconfiguration, DG and DSTATCOM allocation using grasshopper optimization algorithm. Energies, 13(24), 1–24.
Chinnaraj, S., Thenmozhi, K., & Kumar, R. (2020). Optimal integration of DG and DSTATCOM in distribution networks using cuckoo search algorithm. Energies, 13(11), 1–20.
Chinnaraj, S., Kumar, R., & Thenmozhi, K. (2020). Multi-objective simultaneous placement of DG and DSTATCOM using LSF and LSA-SM in radial distribution networks. Journal of Applied Research and Technology, 18(6), 331–340.
Injeti, N., & Yemula, V. K. (2020). Optimal placement of distributed generation considering plug-in electric vehicles using hybrid BO–PSO. Energies, 13(9), 1–19.
Balu, P., Rajan, R., & Senthil Kumar, S. (2021). Optimal DG allocation in radial distribution systems using student psychology-based optimization algorithm. Energies, 14(3), 1–14.
Alam, S., Islam, S., & Kannan, N. I. (2018). Optimal distributed generation integration using mixed-integer nonlinear programming in radial distribution networks. Energies, 11(12), 1–18.
El-Arini, M. M., El-Fergany, A. A., & Hasanien, H. M. (2024). Simultaneous DG, capacitor and reconfiguration planning using improved grey wolf optimizer. Heliyon, 10(2), 1–13.
Mohamed, A. A., Hemeida, M. R., & El-Fergany, A. A. (2022). Optimal allocation of DG and DSTATCOM in radial distribution systems using improved grey wolf optimizer with sensitivity analysis. International Journal of Electrical Power & Energy Systems, 141, 1–13.
Da Silva, I. C., Carneiro, S., de Oliveira, E. J., Costa, J. S., Pereira, J. L. R., & Garcia, P. A. N. (2008). A heuristic constructive algorithm for capacitor placement on distribution systems. IEEE Transactions on Power Systems, 23(4), 1619–1626.
Kannemadugu, R. P., Adhimoorthy, V., & Lakshmi Devi, A. (2025). An effective GTO algorithm-based cost–benefit analysis of DISCOs by optimal allocation of DG and DSTATCOM in a radial distribution network. ITEGAM-JETIA, 11(51), 1–8.
Shukla, V., Mukherjee, V., & Singh, B. (2023). Integration of distributed generations and static var compensators with static synchronous compensators to reduce power losses. Engineering Applications of Artificial Intelligence, 126, 107208.
Patel, P., Patil, N., Mohsen, A., Kashyap, A., Hasan, N. A., Karthikeyan, A., Thatoi, D. N., Gupta, D., & Kamranfar, A. (2025). Multi-objective particle swarm optimization algorithm-based method for optimal placement and sizing of distributed generations and shunt capacitors in a radial distribution network. Results in Engineering, 27, 106514.
Das, D. (2008). Optimal placement of capacitors in radial distribution system using a fuzzy–GA method. International Journal of Electrical Power & Energy Systems, 30(6–7), 361–367.
Haldar, V., & Chakraborty, N. (2015). Power loss minimization by optimal capacitor placement in radial distribution system using modified cultural algorithm. International Transactions on Electrical Energy Systems, 25, 54–71.
Yaghoobi, J., Islam, M., & Mithulananthan, N. (2018). Analytical approach to assess the loadability of unbalanced distribution grid with rooftop PV units. Applied Energy, 211, 358–367.
Hung, D. Q., & Mithulananthan, N. (2014). Loss reduction and loadability enhancement with DG: A dual-index analytical approach. Applied Energy, 115, 233–241.
Quadri, I. A., Bhowmick, S., & Joshi, D. (2018). Multi-objective approach to maximise loadability of distribution networks by simultaneous reconfiguration and allocation of distributed energy resources. IET Generation, Transmission & Distribution, 12, 5700–5712.
Moravej, Z., & Akhlaghi, A. (2013). A novel approach based on cuckoo search for DG allocation in distribution network. International Journal of Electrical Power & Energy Systems, 44(1), 672–679.
Luo, L., Gu, W., Zhang, X. P., Cao, G., Wang, W., Zhu, G., You, D., & Wu, Z. (2018). Optimal siting and sizing of distributed generation in distribution systems with PV solar farm utilized as STATCOM (PV-STATCOM). Applied Energy, 210, 1092–1100.
Lakervi, E., & Holmes, E. J. (1996). Electricity distribution network design. Institution of Engineering and Technology.
Santos, S. F., Fitiwi, D. Z., Cruz, M. R. M., Cabrita, C. M. P., & Catalão, J. P. S. (2017). Impacts of optimal energy storage deployment and network reconfiguration on renewable integration level in distribution systems. Applied Energy, 185(1), 44–55.
Quadri, I. A.., Bhowmick, S., & Joshi, D. (2018). A comprehensive technique for optimal allocation of distributed energy resources in radial distribution systems. Applied Energy, 211, 1245–1260.
Solati, A., Shojaei, A. A., Soltani, S., & Hosseini, S. A. (2025). Fuzzy-based multi-objective optimal allocation of capacitors and DSTATCOMs to minimize installation cost and power loss and improve voltage profile. IET Renewable Power Generation, 19, e70018.
Imran, A. M., Kowsalya, M., & Kothari, D. P. (2014). A novel integration technique for optimal network reconfiguration and distributed generation placement in power distribution networks. International Journal of Electrical Power & Energy Systems, 63, 461–472.
Srinivasa Rao, R., Ravindra, K., Satish, K., & Narasimham, S. V. L. (2013). Power loss minimization in distribution system using network reconfiguration in the presence of distributed generation. IEEE Transactions on Power Systems, 28(1), 317–325.